Below is a listing of currently scheduled projects for Oak Lodge Sanitary District.

Surface Water Mangement Projects - Fiscal Year 2006-2007

Trolley Trail Culvert Drainage Improvements Design - $60,000
Design and construction of a bridge or box culvert so that Upper Boardman Creek can flow through the 66-foot wide Portland Traction Company right-of-way fill located between Naef Road and Roethe Road.

North Trolley Trail Drainage Improvements Design - $25,000
The Clackamas County Parks and Recreation District is converting the trolley right-of-way to a bike path. The exisiting trail contains several drainage limitations, which require upgrading to accommodate the trail. North Clackamas Park and Recreation District will constitutue the lead agency, while the Clackamas County Department of Transporation and Development and Oak Lodge Sanitary District will form partners. Oak Lodge Sanitary District will contribute towards specific drainage facilities.

Concord Mobile Home Park Storm Sewer Design and Contruction - $15,000
Design and construction of 790 feet of 21-inch pipe along the eastern boundary of the Concord Mobile Home Park to replace an existing pipe with inadequate capacity. - TBD

Arista Drive: Jennings to Boardman Avenues Storm Sewer Design - $15,000
Design of 1,000 feet of 12-inch diameter storm sewer to connect portions of existing storm sewer on Arista Drive from Jennings Avenue to the Boardman Avenue intersection.- TBD

River Forest Lake Evaluation - $70,000
The River Forest watershed drains to River Forest Lake. Residents along the lake expressed concerns about the water quality of the lake due to upstream drainage. OLSD has agreed to assist in studying the factors that incluence the lake's water quality.

Sanitary Sewer Projects - Fiscal Year 2006-2007

Secondary System Improvements Construction - $100,000
Construction of interim improvements to the secondary (biological) treatment system at the wastewater treatment plant will address short-term process limitations. Inadequate aerator tank capacity creates the potential for exceeding the plant's effluent limitations. Permanent process improvements will eventually incorporate these interim facilities.

Pump Station #4 Replacement - $65,000
Replacement of the 1960's-era pump station on River Forest Lane with a new submersible Pump Station.

Sanitary Sewer System Master Plan - $400,000
This project involves the creation of a new santiary sewer system master plan guiding OLSD future investment in the wastewater treatment plant. The OLSD treatment plant meets the current requirements, but the facility faces many future challenges, including a chlorine system that must be upgraded to current safety standards, a 60's era biological system with inadequate capacity to meet modern standards, and a highly-eroded gravity thickener. Additionally, the District faces new environmental regulations affecting the Willamette River, which may require renovation or improvements beyond modernization of the treatment plant's aging infrastructure. The master plan will identify the facility needs, develop solutions, and establish a correction plan. The OLSD Board of Directors will review and approve any master plan efforts.

Plant Renovation Design Service Phase 1 - $400,000
Money budgeted to begin implementing the improvements recommended through the Master Plan, pending its approval and creation.